National Pollutant Discharge Elimination System
The instructors from the June 2017 LSPA Course, “Meeting the Requirements of the National Pollutant Discharge Elimination System (NPDES) Remediation General Permit”, have updated the presentation slides because the regulations were still being revised around the same time the RGP was being issuedThe presentation has been posted for your information.  It can be found in the Member Materials section of the LSPA website, under Technical Resources. More details can be found on the EPA website: https://www3.epa.gov/region1/npdes/rgp.html

By: Isaac Anderson, Project Manager, Cooperstown Environmental and LSPA Technical Practices Committee Member

Many of you know that the 2010 Remediation General Permit (RGP), issued by the United States Environmental Protection Agency, Region 1 (EPA) under the National Pollutant Discharge Elimination System (NPDES), expired in September 2015. As noted in the LSPA email blast sent on September 15, 2016, the Draft RGP was published in the Federal Register on August 18, 2016, and EPA accepted public comments until September 19, 2016. What many of you are left wondering is, what happens next, and what should you do in the interim if you have a project that requires coverage under the RGP before the new RGP is available?

Read More